Power = work done / time taken
This type of question, asked 2 times: CDS 1 2025, CDS 2 2025. All 2 questions below, oldest first.
Try each one first, then open its answer.
Question 1
CDS 1 2025
24The minimum power required to lift a mass of 50 kg up to a vertical distance of 8 m in 10 s is : (Take )Tap an option to check your answer.
Question 2
CDS 2 2025
25Assume 'A' does 500 J of work in 'x' minutes and 'B' does 1000 J of work in 20 minutes. If the power delivered by 'A' is and 'B' is and , then 'x', in minutes is :Tap an option to check your answer.