Day 44: SSC CPO Quant
5 questions. Try each one first, then open its answer.
Question 1
Time and Work. Asked once: 12 Dec 2025 S1 (same type asked 4 times) See all 4 of this type
111A small construction firm has 6 workers who can complete a road patching job in 8 days. If 4 more workers are added, how many days will they take to finish the same work?Tap an option to check your answer.
Question 2
Time, Speed and Distance. Asked once: 11 Dec 2025 S1 (same type asked 4 times) See all 4 of this type
108A man walking at 6 km/h reaches the market in 40 minutes. If he walks at 4 km/h, how long will he take to reach the market?Tap an option to check your answer.
Question 3
Mensuration 3D. Asked once: 10 Dec 2025 S2 (same type asked 4 times) See all 4 of this type
108The total surface area of a cone is 616 and its base radius is 7 cm. Find the slant height.Tap an option to check your answer.
Question 4
Mensuration 3D. Asked once: 28 Jun 2024 S2 (same type asked 4 times) See all 4 of this type
118A hollow sphere of external and internal diameters of 10 cm and 6 cm, respectively, is melted and made into another solid in the shape of a right circular cone of base diameter 10 cm. Find the height of the cone.Tap an option to check your answer.
Question 5
Mensuration 3D. Asked once: 12 Dec 2025 S1 (same type asked 4 times) See all 4 of this type
117A spherical balloon has a radius of 8 cm. What is the ratio of the volume of the balloon to the volume of a smaller balloon with a radius of 4 cm?Tap an option to check your answer.