PYQ Vault

Playbook

Time and Work

46 q · 7% HARD · falling from 2.7 to 1.3 a paper. Work in rates or man-days, never in days directly, and the chapter is free marks.

Questions in the bank
46
q/paper (21 papers)
2.19
Tagged HARD
7%
Subtopics
4

Strand: Quick-Win

When you’ll see it

People or pipes finishing a job alone and together.

How this chapter is tested

46 questions, falling from 2.7 a paper in 2016-2020 to 1.3 in 2024-2026, at 7% HARD. Man-days and mixed gangs have never set a HARD question.

Work in rates (1/n of the job a day) or in man-days — never add days directly.

The sub-skills

The distinct skills inside the chapter, in the order to learn them.

  • Work rates

    Rates add: together A and B finish in ab/(a + b) days.

  • Man-days

    Men × days (× hours) is constant for one job.

  • Mixed gangs

    Convert women or boys to men-equivalents first.

  • Pipes

    A filling pipe is a positive rate, a leak negative.

Traps to expect

Distractor shapes this chapter reuses. The Traps page covers the ones that cut across chapters.

  • Adding days

    A in 4 days and B in 6 days finish together in 2.4 days, not 5.

Learn it before you drill it

This chapter has full teaching notes — foundations, worked examples, self-checks and a mastery check for each subtopic. Read the notes once, then drill subtopic by subtopic below.

Time and Work notes

Drill every Time and Work question

46 questions from the bank, across 4 subtopics.

Drill one subtopic at a time

The 4 subtopics, in teaching order.

Related playbooks

Often paired with this one — the technique or the trap overlaps. Drill these next.