Give the job a number of units every worker's time divides, then add daily rates, compare efficiencies, convert men and women into one kind of worker, and run turns cycle by cycle.

Why this matters

18 questions in the Tier II bank, 8 EASY and 10 MODERATE. The MODERATE ones have someone joining, leaving or taking turns, and the units method handles each one the same way.

Concept 1 of 4: Total work as units

Give the whole job a number of units that every worker's time divides, usually the LCM of the times. Each worker then does a whole number of units a day, and the rest is plain arithmetic.

Definition

  • Total work == LCM of the separate times.
  • A worker's daily units == total ÷\div that worker's time; workers together add their units.
  • Doing a fraction f of the job in d days means the whole job takes d÷fd \div f days.
  • Given the pairs A + B, B + C and C + A, add all three to get twice the rate of all three together.
  • Someone joins or leaves: work done before ++ work done after == the whole job.

Two workers together

time together=xyx+y for workers taking x and y days\text{time together} = \frac{xy}{x + y} \text{ for workers taking } x \text{ and } y \text{ days}

Diagram · the whole job as 36 units

Job = LCM of 12 and 18 = 36 unitsA: 36 ÷ 12 = 3 a day. B: 36 ÷ 18 = 2 a day.day123456789101112together, 4 days4 × (3 + 2) = 20 unitsB alone, 8 days16 ÷ 2 = 8A's unitsB's units

Give the job 36 units, the LCM of 12 and 18, and each worker does a whole number a day: A 3, B 2. Together for 4 days they do 20 units; the 16 left take B alone 8 days. Each cell is one unit; the thick lines mark the end of each day.

Worked example

A can finish a job in 12 days and B in 18 days. They work together for 4 days, then A leaves. How long does B take to finish the rest?
Practise this conceptself-check · 3 quick reps

The same idea in a real exam question:

SSC CGL Tier II · 2025 · Tier II (CGL 2025), 18 Jan 2026 · Q19Moderate

Example 1 · Time and Work · Work Rates

P and Q can do a piece of work in 20 days and 30 days, respectively. They work together for 6 days, and then Q is replaced by R. If the rest of the work is completed by P and R in 8 more days, in how many days can R alone complete 60% of the work?

Adding the days instead of the rates

Workers taking 12 and 18 days do not take 30 days together, or 15. Add their daily units (3 + 2 of 36) to get 7157\frac{1}{5} days.

Concept 2 of 4: Efficiency and wages

Efficiency is work done per day. If A is 25% more efficient than B, A does 1.25 times B's daily work and so needs B's time divided by 1.25. Wages for a shared job split in the ratio of the work each person did.

Definition

  • A is r% more efficient than B: A's daily work =(1+r100)×= \left(1 + \frac{r}{100}\right) \times B's, and A's time == B's time ÷(1+r100)\div \left(1 + \frac{r}{100}\right).
  • Efficiencies in the ratio a : b mean times in the ratio b : a.
  • 'A is k times as efficient as B', and together they take T days: B alone takes (k+1)T(k + 1)T days.
  • Pay for a shared job is split in the ratio of work done (daily rate ×\times days worked).

Efficiency and time

timeAtimeB=efficiencyBefficiencyA\frac{\text{time}_A}{\text{time}_B} = \frac{\text{efficiency}_B}{\text{efficiency}_A}

Worked example

A takes 24 days for a job, and B is 50% more efficient than A. How long do they take working together?
Practise this conceptself-check · 3 quick reps

The same idea in a real exam question:

SSC CGL Tier II · 2019 · Tier II (CGL 2019), 15 Nov 2020 · Q35Easy

Example 2 · Time and Work · Work Rates

A can do a piece of work in 15 days. B is 25% more efficient than A, and C is 40% more efficient than B. A and C work together for 3 days and then C leaves. A and B together will complete the remaining work in:

Reading '25% more efficient' as '25% less time'

25% more efficient divides the time by 1.25, which is 20% less time. 20 days becomes 16, not 15.

Concept 3 of 4: Men, women and man-days

When two groups finish the same job, their total work is equal. Setting the two totals equal tells you how many women one man is worth, and then any group can be written as one kind of worker.

Definition

  • Work == workers ×\times days (×\times hours a day).
  • Same job by two mixed groups: write each as men and women, set the two totals equal, and read off one man in women.
  • Then turn every group into women (or men) and divide the job by the group size.
  • For the same job, M1D1H1=M2D2H2M_1 D_1 H_1 = M_2 D_2 H_2.

Same job, different crews

M1D1H1=M2D2H2M_1 D_1 H_1 = M_2 D_2 H_2

Worked example

2 men and 3 women finish a job in 8 days; 4 men and 2 women finish it in 6 days. How long do 6 women take?
Practise this conceptself-check · 3 quick reps

The same idea in a real exam question:

SSC CGL Tier II · 2020 · Tier II (CGL 2020), 29 Jan 2022 · Q60Moderate

Example 3 · Time and Work · Work Rates

4 men and 5 women can complete a work in 15 days, whereas 9 men and 6 women can complete it in 10 days. To complete the same work in 7 days, how many women should assist 4 men?

Counting men and women as equal workers

If one man does the work of 1.5 women, 2 men and 3 women are worth 6 women, not 5 workers. Convert before you add.

Concept 4 of 4: Working in turns

When workers take turns day by day, find what one full round of turns does, fit in as many whole rounds as you can, and finish the last bit with whoever is next in line.

Definition

  • Units per round == the sum of what each turn does.
  • Fit whole rounds without overshooting; then the remainder == total −- rounds ×\times units per round.
  • Finish the remainder turn by turn, in order, using part of a day if needed.
  • If someone stops a few days before the end, call the total time T and give each worker T minus their gap.

Rounds and the last part

job=whole rounds×units per round+the last part\text{job} = \text{whole rounds} \times \text{units per round} + \text{the last part}

Worked example

A can do a job in 10 days and B in 15 days. They work on alternate days, A first. In how many days is the job done?
Practise this conceptself-check · 3 quick reps

The same idea in a real exam question:

SSC CGL Tier II · 2022 · Tier II (CGL 2022), 7 Mar 2023 · Q11Moderate

Example 4 · Time and Work · Work Rates

P, Q and R can finish a work in 5 days, 10 days, and 15 days, respectively, working alone. P and Q works on first day, P and R works on second day and P and Q works on third day and son on till the work is completed. In how many days the work will be completed?

Assuming the job ends at the end of a round

After the whole rounds, the next turn may finish the job partway through a round. Step through the remaining turns one at a time.

Summary — formulas & gotchas at a glance

A revision cheat-sheet for the formulas and gotchas above. Click any concept name to jump back to its full explanation.

Formulas (4)

  • Total work as units

    Two workers together

    time together=xyx+y for workers taking x and y days\text{time together} = \frac{xy}{x + y} \text{ for workers taking } x \text{ and } y \text{ days}
  • Efficiency and wages

    Efficiency and time

    timeAtimeB=efficiencyBefficiencyA\frac{\text{time}_A}{\text{time}_B} = \frac{\text{efficiency}_B}{\text{efficiency}_A}
  • Men, women and man-days

    Same job, different crews

    M1D1H1=M2D2H2M_1 D_1 H_1 = M_2 D_2 H_2
  • Working in turns

    Rounds and the last part

    job=whole rounds×units per round+the last part\text{job} = \text{whole rounds} \times \text{units per round} + \text{the last part}

Watch out for (4)

Test yourself on Time and Work

10 past SSC CGL Tier II questions from this chapter, timed at 10 minutes and marked the way the exam marks it. You see your score and every answer the moment you finish. Free to start.