SSC CGL Tier II Quantitative Aptitude · Formula sheet

Time and Work formulas

6 formulas and 6 common traps for SSC CGL Tier II Quantitative Aptitude Time and Work, grouped by subtopic.

Full notes with worked examples

Work Rates

Learn this subtopic in the notes

Total work as units

Two workers together

time together=xyx+y for workers taking x and y days\text{time together} = \frac{xy}{x + y} \text{ for workers taking } x \text{ and } y \text{ days}

Efficiency and wages

Efficiency and time

timeAtimeB=efficiencyBefficiencyA\frac{\text{time}_A}{\text{time}_B} = \frac{\text{efficiency}_B}{\text{efficiency}_A}

Men, women and man-days

Same job, different crews

M1D1H1=M2D2H2M_1 D_1 H_1 = M_2 D_2 H_2

Working in turns

Rounds and the last part

job=whole rounds×units per round+the last part\text{job} = \text{whole rounds} \times \text{units per round} + \text{the last part}

Common traps

Adding the days instead of the rates

Workers taking 12 and 18 days do not take 30 days together, or 15. Add their daily units (3 + 2 of 36) to get 7157\frac{1}{5} days.

Reading '25% more efficient' as '25% less time'

25% more efficient divides the time by 1.25, which is 20% less time. 20 days becomes 16, not 15.

Counting men and women as equal workers

If one man does the work of 1.5 women, 2 men and 3 women are worth 6 women, not 5 workers. Convert before you add.

Assuming the job ends at the end of a round

After the whole rounds, the next turn may finish the job partway through a round. Step through the remaining turns one at a time.

Pipes and Cisterns

Learn this subtopic in the notes

Inlets and outlets together

A leak from two fill times

leak alone=abb−a\text{leak alone} = \frac{ab}{b - a}
  • a,ba, bfill time without the leak, and with it

Pipes opened in turn

Net change in one cycle

net per cycle=inlet units−outlet units\text{net per cycle} = \text{inlet units} - \text{outlet units}

Common traps

Adding a leak's rate

A leak works AGAINST the inlets. A 6-hour tap with a 24-hour leak fills at 16−124\frac{1}{6} - \frac{1}{24}, not 16+124\frac{1}{6} + \frac{1}{24}.

Counting whole cycles to the very end

Dividing 20 units by a net loss of 1 a cycle suggests 40 hours, but the emptying pipe clears the last 4 units on its own in hour 33. Step through the end turn by turn.