Efficiency Ratios

Efficiency is work done per day, so a worker who is k times as efficient takes one k-th of the time, and a ratio of times is a ratio of efficiencies turned upside down.

Why this matters

Thirteen questions in the bank, six EASY and seven MODERATE, four of them from the 2025 shifts: one worker 40% more efficient than another, one working 3.5 times as fast and taking 45 days less, times given in a ratio. Giving each worker its efficiency as units a day turns every one of them into whole numbers in one line.

Concept 1 of 2: Efficiency ratio and time ratio

Twice as efficient means twice the work in a day, so the same job takes half as long. A ratio of efficiencies flips over to become the ratio of times.

Definition

  • Efficiency is the work done per day, the same thing as the rate.
  • Time is inversely proportional to efficiency: if the efficiencies are p:qp : q, the times are q:pq : p.
  • "x% more efficient" means the efficiencies are (100+x):100(100 + x) : 100. Reduce it: 25% more is 5:45 : 4, 40% more is 7:57 : 5, 50% more is 3:23 : 2, 60% more is 8:58 : 5.
  • "k times as efficient" multiplies the rate by kk and divides the time by kk.
  • Fast route, units from efficiency: give each worker its efficiency in units a day. The whole job == efficiency ×\times own days for any one worker, and working together you add the efficiencies.

Efficiency and time

TATB=EBEAWork=E×T\frac{T_A}{T_B} = \frac{E_B}{E_A} \qquad \text{Work} = E \times T
  • EA,EBE_A, E_Befficiencies (work per day) of A and B
  • TA,TBT_A, T_Bdays each needs alone
  • E, Tone worker's efficiency and the days that worker needs

Worked example

A is 25% more efficient than B. B alone can finish a job in 30 days. How long do A and B take working together?
Practice this conceptself-check · 4 quick reps

The same idea in a real exam question:

SSC CGL · 2025 · Tier I, 14 Sep 2025, Shift 3 · Q64Easy

Example 1 · Time and Work · Efficiency Ratios

The ratio of the time taken by A and B to complete a task is 3:23 : 2. If B can complete the task alone in 18 hours, how many hours will they take to complete the task if they work together?

Not flipping the ratio

If the efficiencies are 5:25 : 2, the times are 2:52 : 5, not 5:25 : 2. The more efficient worker always takes less time.

Reading 60% more efficient as 60% less time

A worker 60% more efficient takes 100160=58\frac{100}{160} = \frac{5}{8} of the time, a cut of 37.5%, not 60%.

Concept 2 of 2: A faster worker who takes fewer days

If A is 3 times as fast as B, B needs 3 times A's days. The gap between their times is then 2 of A's times, and that pins down A's time.

Definition

  • If A works kk times as fast as B and takes tt days, B takes ktkt days.
  • The gap is kt−t=(k−1)tkt - t = (k - 1)t. Set it equal to the stated difference DD: t=Dk−1t = \frac{D}{k - 1}.
  • Together they take t×ktt+kt=ktk+1\frac{t \times kt}{t + kt} = \frac{kt}{k + 1} days.
  • Wording: SSC's keys read "k times more efficient" as kk times as efficient, although strictly the words mean k+1k + 1 times. Solve with kk the way the key does, and look at the options before choosing.

Faster worker, fewer days

t=Dk−1Ttogether=ktk+1t = \frac{D}{k - 1} \qquad T_{\text{together}} = \frac{kt}{k + 1}
  • khow many times as fast A is as B
  • tdays A takes alone
  • Dhow many fewer days A takes than B

Worked example

A works 4 times as fast as B and takes 30 days less than B to finish a job. How long do they take working together?
Practice this conceptself-check · 3 quick reps

The same idea in a real exam question:

SSC CGL · 2023 · Tier I, 21 Jul 2023, Shift 1 · Q68Moderate

Example 2 · Time and Work · Efficiency Ratios

A works 3.5 times as fast as B, and A takes 45 days less than B to complete a job when each works alone. Calculate the number of days taken to complete the same job if A and B work together.

Dividing the gap by k

If A is 3 times as fast as B and takes 40 days less, A's time is 403−1=20\frac{40}{3 - 1} = 20 days, not 403\frac{40}{3}. The gap is k−1k - 1 of A's times.

Summary — formulas & gotchas at a glance

A revision cheat-sheet for the formulas and gotchas above. Click any concept name to jump back to its full explanation.

Formulas (2)

  • Efficiency ratio and time ratio

    Efficiency and time

    TATB=EBEAWork=E×T\frac{T_A}{T_B} = \frac{E_B}{E_A} \qquad \text{Work} = E \times T
  • A faster worker who takes fewer days

    Faster worker, fewer days

    t=Dk−1Ttogether=ktk+1t = \frac{D}{k - 1} \qquad T_{\text{together}} = \frac{kt}{k + 1}